Here is the beginnings of the detailing of the new cliffs and attached platform structures. In this photograph there are four areas..
Upper left - recreation room and shower area behind it
Lower Left - dining area, kitchen behind that but still needs to be built
Upper Right - gym
Lower Right - mission planning
The dining area is mostly done. More stools at the bar area and changing the bar trim to dark red with some studs for food and drink.
The gym is also mostly done. Need to add a very large screen to the far back wall. This will have some large landscape on it to remind the inhabitants of what a lush green planet looks like compared to the outpost they are on.
The mission planning area only has the one planning table installed. This still needs some deep thought.
No comments:
Post a Comment