Tuesday, January 21, 2025

Main Entrance Rebuild - Part TWO

 


 As described in the last post on this, I need to redesign the power distribution.  But I was not motivated to drill holes in 16 x 16 plates.

The holes need to be where the arrows are pointing.  Those are in 16 x 16 plates.



Thus I redid the plate implementation.  Instead of 16 x 16 plates, I used a combination of different plates to create 1 x 1 hole underneath the two front towers.  The picture below shows how the reinforcement on the bottom has changed.  The arrows point to where the hole is.


 This will allows for wires to run up  the tower and then across the ceiling of the conference room and the briefing room.  Since LED controllers will be installed in the towers to power up the two generators, this will allows to the briefing room to go from red to white on a periodic basis. 


No comments:

Post a Comment