Friday, April 21, 2023

Brick Days 2023 Are Here

 

 Well we started with a bunch of boxes at 9:30AM and at 5PM we were here

And here is what happened in between.

Unpacking in the correct order is important.  There was lots of room on the table, but not lots of excess.. 

Basically every module had its own box.  The only exception was the large entrance that was in a 64qt container along with a cliff and all the entrance attachments. 



After 1300+ miles, some things came loose.  So there was some rebuilding.

When trying to line up black parts in the shadows, you need extra light.

Balancing the generator on the crane.


Getting closer.

And here it is finished.

The Well Generator.  Ends up the Blue LEDs I am using have a strong UV component (not unusal actually) and the transparent neon green visors will fluorescence under this light.

A patrol returning to the Space port.

The large Space Gun and the Vertical Generator.

The Main entrance.

The horizontal generator.

The original module.

A look at the crane section lowering a new generator for the Ray gun module.

And in the back, a group of maintenance workers work on finishing the flooring fpr the hanger, while a group of supervisors look on with their coffee.

Two hangers with units under inspection.

An empty hanger that just finished construction.

On top a patrol squad doing PT while two workers try to wrestle a rogue droid..

A view of the generator being installed.

The new Ray Gun module.

Tomorrow what everyone else did.



 

 

 

 

 

No comments:

Post a Comment