Thursday, April 4, 2024

Another Curved Cliff - Post 8

 

Next is wiring the platforms.

Since these wires don't move, the connection end is soldered into the interconnection board.  Then the wire runs up the lift arm support column. Then it dives into the Technic brick and turns 90 degrees through a pin hole.

I use black vinyl tape to secure the wire to the lift arm support column.

In places where the wire might droop and be seen, I use these 2 x 2 modified plates with pin holes.  The other upside to these is that after the all the wires are soldered in, any excess wire can be handled by moving the plate to take up the slack.

Another view with another plate added.

The wires are soldered in place and you can see how the wires are run through the plates pin holes as well as through the technic bricks.

This is is the ceiling of the second floor.

I probably could have run the wires thorough the technic bricks to help support them, but then soldering would have been more difficult.  If the wires ever droop down, then I will use a small plate to trap them between the long technic bricks.

Here is what the lighting looks like for the angled platform.

A different view.

This is the lighting for the matching cliff section.  I went with 3 lights because this was going to be an active maintenance control area on the first floor and a coffee bar on the upper floor.

Another view.


 


Wednesday, April 3, 2024

Another Cruved Cliff - Post 7

 

Now it is time to build out the platforms behind the cliffs.  On the other side the curved cliff platforms each had a angle on one side.  This was mostly done because one of the angles was 45 degrees.  Putting both angles on one platform, would have made that platform very small and not very usable.

In the above picture you can see that the left platform is a standard rectangle while the one on the right has angles on both sides. Because the angles are around  30 degrees, the platform does not get to be too small.

A slightly different view.  You can see the light bluish gray wedge plates that I used for the angle.  In the cliff I used either tan or dark tan wedge plates to blend in with the cliff motif.  In the platforms, the flooring will  be light bluish gray, thus the wedge plates will the same.  It helps blend in the edges wher the tiles wont be.

A better view of wedge plates.

The edges on the second floor will have to be canter levered.  So I use 4 x 4 and 4 x 6 Technic bricks to provide the support.

Then the wedge plates fit on then to form the angle.  You will notice the order of the wedge plates on the first and second floor is different.  It ends up that the 3 x 2 and 6 x 3 wedge plates are interchangeable.  Sort of like 3+2 and 2+3 give you the same answer.  On the first floor the support structure had almost infinite possibilities.  But here on the second floor with the canter lever, that is not true.  This was the only possible solution.  Plus the angle on the first and second floor had to match exactly.

On the other side the order on the first floor had changed to make the angle line continuous, so it had to change on the second floor also.

Here the first and second floors are assembled and we are doing a fit check.

A slightly different view.

Now I am working on the plateau.  Same problem as the second floor, as parts of this plateau are going to be canter levered.  The important part is getting the angles to line up.  The rest is just filler.

A view from the back.

Now I need to provide the support structure of the plateau in the cliff portion.  Before I had just used 1 x 8 bricks to do this, but that has proven to be fragile.  Here the tan plates can not be 16 x 16, they have to be something less, which will require a flexible support structure.  The 6 x 8 Technic brick with open center provides that structure.  When the plates are put on top they will tie everything together and provide a strong support structure.  

Here the plateau is done.  Also shown is the small angular piece the snaps in with Technic pins that draws the line from the main hanger platforms to the end platform.  Careful inspection of the right side will show that this extension piece sticks out one stud.  Unfortunately there is no combination of wedge plates that will match this.  The only choice is to extend the main hanger platforms one stud, but that brings with it multiple complications.  So for now there is a small mismatch.

Here is the front view, ready for rock work.  The angles came quite nice.  The left side coudl be extended some and later on I will look into this.  It would help with concealing the angular break in the rock work.







Tuesday, April 2, 2024

Another Curved Cliff - Post 6

 

I have spent a lot of time trying to get the angles correct on this section.  As I explained in this post, it took a while to understand which wedge plates were going to generate the same angle.  the Following pictures show how this was done.

This shows the angle going back to the platform first floor from the cliff.

On the other side, the same thing.

Just a different view.

You have to check the angle constantly when using wedge plates, especially if they are different sizes.  

These are the three wedge plates that I used.  But there is a very specific pattern where these will line up correctly.  Which can make it difficult to get the angle continuous.  

This picture illustrates the problem.  The left side arrangement is fairly straight forward.  But the right side arrangement shows that one row of studs must be skipped for to maintain a continuous angle.





Monday, April 1, 2024

More Bulk Bricks


 Part of the last few weeks has been stopping at various used brick locations and rummaging through their collections.  But because of the work on the display for Brick Days, I never got to sorting and storing this collection.  I would occasionally pick parts out that I needed, but that was the extent to which I attacked this problem.  The picture above is only part of the total amount I collected, since I also got several bags at Brick Days as these photos show me rummaging through the brick piles.




Here I have reduced the pile to different containers.  A large portion of the bulk bricks was Technic bricks, which I have already put away. 

We are basically down to the end here.  Lots of single pieces that I have to remember where they go.  Dont want multiple pieces of the same piece in multiple locations.

At Brick Days I answered this basic question multiple times and I have said it before, but it bears repeating.  Of my Lego time, I spend at least 20% of it sorting and storing bricks.  This is either from bulk purchases and from the occasional cleanup I do while building.  My basic philosophy is this, if I have the brick and can't find it, then I really don't have the brick.

 


 

 

 

Friday, March 29, 2024

Brick Days 2024 - Light Show

 


 Here are the pictures from the Saturday Night Light show.



Van Halen Playing on Saturday night

Here is the Space Outpost










Front Side Video

 

Back Side Video


 and humbled by the award for best lights.