I am starting a continuous series of posts of just small items. Things that do not merit a full blog post by themselves, but are none the less interesting.
Sorting through a Bricklink order. This can take a while depending on the size of the order. I still continue to spend at least 20% of my build time, sorting and storing bricks. Either ones I just bought or cleaning up after a build session.
The beginnings of the shower facility next to the gym. Still needs the white round tiles for floor tiling. The area to the left will be a soaking tub. The area to the right will be the changing room.
The hanger that connects to the dining/gym/recreation area is getting a partial glass partition. Instead of the open type it was before. It would be nice to come up with a door of some type for the lower section. Also not sure about the color scheme here. I am thinking that the light blokish gray brick and the tan support needs to be black. Just not sure yet.
This is where the Kitchen/serving area will be. There will be four large menu screens. The four areas will be appetizers, main course, desert and drinks. It is not a huge space, but is buried towards the back, so it will look larger than it really is.
And that is all for now.
No comments:
Post a Comment