Thursday, March 23, 2023

Cliff Wall Build Update 1

This is a simple update to show how the cliff walls are progressing.  I don't sit down and do one wall.  I find that I get into a pattern.  By working on different walls at different times, the pattern seems to stay more random.  The wall is 6 studs deep from the edge of the sand green walkway to the top of the cliff.  There are 3 studs at the base up to the first level.  Then one stud of depth is added.  This goes to the base of the top where another one stud depth is.  Finally at the top is the final single stud of depth.  Thus the cliff is fairly steep. 

Here is the start of one of the cliff walls.  This wall start is non-traditional as it has non rectangular slopes in it.  I tried to do something a little different.

Here this wall continues.  There is also a non-traditional portion of the left side.  Then I added a small platform for details to be added.  In this case it is minifig for now.

Here this one is done up to the final level going to the top.  This was finished with more traditional cliff techniques.

Here are two sections that are now done.  This one  is done in traditional techniques.

And this one has some non-traditional techniques.



No comments:

Post a Comment